ASSESSING THE EFFICIENCY OF WATER AND CAPITAL RESOURCE UTILIZATION IN HYDROPOWER ENTERPRISES: THE CASE OF JSC “UZBEKHYDROENERGO”

Authors

  • Abdurashid Abduazim ugli Abdulazizov Independent Researcher at Tashkent State Technical University Author

Keywords:

Keywords: hydropower, resource saving, capacity factor, unit cost, capital intensity, asset turnover, water availability.

Abstract

Abstract. This paper assesses how efficiently water, production capacity and capital are used at JSC “Uzbekhydroenergo”, the main hydropower producer of Uzbekistan, over 2019–2025. A set of unit indicators – capacity factor, unit cost, capital intensity and asset turnover – is calculated on the basis of the company’s IFRS financial statements. It is shown that installed capacity has grown steadily while generation continues to follow the water year, so that each additional unit of capital yields a declining output. Recommendations are proposed for including resource-based indicators in the company’s management reporting.

References

1.Decree of the President of the Republic of Uzbekistan No. PF-158 of September 11, 2023, “On the Strategy ‘Uzbekistan – 2030’.”

2.Decree of the President of the Republic of Uzbekistan No. PF-60 of January 28, 2022, “On the Development Strategy of New Uzbekistan for 2022–2026.”

3.International Hydropower Association. 2026 World Hydropower Outlook. London: IHA, 2026. https://www.hydropower.org/publications/2026-world-hydropower-outlook

4.Ember. Global Electricity Review 2026. London: Ember, 2026. https://ember-energy.org/latest-insights/global-electricity-review-2026/

5.IRENA. Renewable Power Generation Costs in 2025. Abu Dhabi: International Renewable Energy Agency, 2026.

6.IEA. Hydropower Special Market Report: Analysis and Forecast to 2030. Paris: International Energy Agency, 2021. https://www.iea.org/reports/hydropower-special-market-report

7.Førsund, F. R. Hydropower Economics. 2nd ed. New York: Springer, 2015.

8.Allaev, K. R., I. U. Rakhmonov, and U. M. Mamadaminov. “Current State and Development Prospects of Uzbekistan’s Electric Power Industry.” Problems of Energy and Sources Saving 1, no. 1 (2025): 1–7.

9.Akhmedov, O., and O. Begmullaev. “The Ways Ensuring Energy Balance in Uzbekistan.” E3S Web of Conferences 216 (2020): 01137. https://doi.org/10.1051/e3sconf/202021601137

10.Consolidated IFRS financial statements of JSC “Uzbekhydroenergo” for 2019–2025.

Downloads

Published

2026-11-10